general contractors and construction managers

PACIFIC NATIONAL GROUP

Catheterization Laboratories

Architects

EwingCole

 

Location

Los Angeles, CA

 

Size

1,700 square feet (2 labs)

 

Duration

12 months

 

Market

Healthcare

The 2-phase Catheterization Labs remodel at Davis Research Center features the latest technology in  cardiac imaging and treatment, including equipment from Toshiba, Steris support booms, and Phillips physiological monitors. New equipment required careful coordination with the architect to ensure proper placement and clearance of steel supports.

 

During each construction phase, the hospital continued operations in the adjacent lab and in the control room that serve both labs. Keeping the medical facility clear of construction-related contaminants required the highest level of infection control and on abundance of off-hours work.

 

The product of our work includes new electrical panels, new humidifiers, new reheat coils, a gas manifold system, electrical panels, panel-boards and transformers.

Connect with the project team on LinkedIn: Steve Mathison

See other featured projects

© 2017 Pacific National Group. All rights reserved.